Demolition and reconconstruction

The demolition started on 22nd January and only took a few days before all the structure had gone.














Groundworks:  hammering was felt to be too disruptive locally so pile were bored and back filled with concrete.
The small yellow dots in the ground show the pile position sites.




The piles are visible in the foundation trenches - which are very wet at 1.5m as predicted.